Kataoka, Ohishi, Kokeyama
We tried to shine the end station, but did not succeed tonight. Our plan was to shake PR3 mirror both in pit and yaw while watching DC PD on EXA to hit a lucky spot.
First I had to add an oscillator on k1pr3 model. I added LCKINs on IM stage. New model was checked in on svn. Screens were also adapted.
So we shook PR3 both in pit and yaw at 0.03 Hz and 0.07Hz (LOCKING EXC MON attahced). Amplitude was 100. No light on EXA PDA1 was seen. A lot of 60Hz lines were observed instead (See, the second and third attachements). Probably the PD has the ground loop and it should be hunt. Also PR3 oplev pit yaw channels were not working well likely becaues of some software or data sender problems.
More fixing is necessary before finding the beam after all! I couldn't try further after a lot of the other works.