Reports 1-1 of 1 Clear search Modify search
DGS (General)
keiko.kokeyama - 21:23 Saturday 05 March 2016 (921) Print this report
Network switches swapped

Kataoka, Kokeyama

We swapped the big Baffalo POE network switch from PR2 rack to the mine digital room. Two small baffaro network switches were installed in PR2 rack and IOO rack. One in PR2 rack is for the machine control, and one in ioo rack is for picomotors. For picomotors, one more small baffaro switch is necessary.

The POE switch originally used for picomotor (FXC) was moved to PR2 rack, to drive PR2 and BS cameras. A LAN cable should be connected to this from the main camera switch in the digital room.

Search Help
×

Warning

×