Installing TMS-VIS-Y

Uraguchi, K. Tanaka, Simon, Akutsu in the afternoon

We have successfully installed the TMS-VIS into the EYT chamber. We did it (Fig 3)!

  • Uraguchi-san attached six geophones to the TMS-VIS.
  • Along with the work, I checked resistors of all the coils and it seemed ok (memo: the following table I measured).
  • Then we craned the TMS-VIS with four belt-slings (Fig 1), and broght into the EXT chamber.
  • We also fixed some of the fixing bolts (Fig 2).

The installation was originally planed tomorrow; we did faster than our schedule.) We will install the BRT part on the TMS-VIS tomorrow.

 

Table to show my measurement. The nominal values should be

  • LVDT inner coil: 210 ohm, 67 mH
  • LVDT outer coil: 180 ohm, 42 mH (see for example here)
  • Act coil: 133 ohm, 55 mH (see for example here)

Note that two "LVDT outer coils" are parallelly connected to pin 2-7, so the nominal values of them should be half of the above.

LVDT, actuator Resitances between two pins
LVDT8, Act18 Pin 1-6: 211 ohm
Pin 2-7: 90 ohm
Pin 3-8: 136.2 ohm
LVDT11, Act1 1-6: 211 ohm
2-7: 91.7 ohm
3-8: 135 ohm
LVDT9, Act16 1-6: 210 ohm
2-7: 91.1 phm
3-8: 134 ohm
LVDT12, act6 1-6: 213ohm
2-7: 89.8 ohm
3-8: 135.8 ohm
LVDT6, act13 1-6: 211.5 ohm
2-7: 90.6 ohm
3-8: 135.7 ohm
LVDT10, act17 1-6: 211.4 ohm
2-7: 90.6 ohm
3-8: 135.5 ohm