As the preparation of the high power beam dump (HPBD, which is in the IFI chamber to dump the PRM reflection) thermometer, a new channel
K1:AOS-HPBD_IFI_TEMPERATURE
was added on k1vists model, which is running on k1imc0 chassis. The model was restarted. It will wait for daqd restart whenver happens next time.
The hardware will be installed and connected next week.