The pump down of ITMX is finish on April 4th and I started to check the transfer functionsof the tower part.
I measured the following transfer functions:
- IP: L (pic1), T (pic2), Y (pic3)
- BF: L (pic4), T (pic5), Y (pic6)
- GAS filters: F1 (pic7), F2 (pic8), F3 (pic9), BF (pic10).
All stages looks to be healthy: now all damping controls are turned on.