Akutsu, Kokeyama
We selected the lens, adjusted, and fix the camera stage on EY. Resulting image is attached.
Also 50m (10m x 5) Dsub 15pin cable is placed for the EY oplev QPD. Connecting to the EY rack did not finish because we still need to bring a whitening board and two Dsub 9 pin cables. Should be finished on monday.