Reports 1-1 of 1 Clear search Modify search
AOS (Beam Reducing Telescopes)
tomotada.akutsu - 23:53 Thursday 21 February 2019 (8180) Print this report
Geophone pod assy

At Mitaka.

I have re-started the assembly of geophone pods for TMS-VISY according to the procedure document. Via the digital system at NAOJ-ATC, the output signal was checked before and after tightening each pod.

But... again the group of the pods include at least one bad pod, and unfortunately I picked up the bad one firstcrying ; the bad point was that one of the M8 screw holes was badly manufactured; I found an M8 bolt was about to gall. I tried some ways (including ethanol-dropping) to somehow use this hole as was, but finally gave up and detached the other healthy bolts that were already inserted (actually the about-to-gall one was the final bolt to be inserted...crying).

Anyway, using another pod, I completed a geophone pod with a horizontal L-4C. This is called geophone H1 for TMS-VISY (#15 geohpone with the driver sn164).

Need to consider how to overcome the bad pod...

Images attached to this report
Comments to this report:
tomotada.akutsu - 22:40 Tuesday 26 February 2019 (8216) Print this report

Done on Feb 24, 2019: after re-tapping some screw holes of the pods by Uraguchi-san, I completed the assembly of the remiaing five geophone pods. There were spectral measurements for each.

Search Help
×

Warning

×