IOO (General)
keiko.kokeyama - 20:25 Wednesday 16 January 2019 (7676) Print this report
high power beam dump assembled

[NAOJ Sato, Kokeyama]

The V-shape high power beam dump was assembled today. Also the copper flange attachement was installed in the innner side of the phi 400 flange of +Y of the IFI chamber. We also made 10 of the thick heat links to connect from the dump to the copper flange. 

Our next plans
 - assemble one more dump and test with a high-ish power in the PSL room
 - place the first dump in IFI chamber, connect the heat links
 - misalign and tune the PRM angle so that the beam hit to the dump

Photos will be uploaded later.

Comments to this report:
keiko.kokeyama - 10:09 Thursday 17 January 2019 (7680) Print this report
Here are some photos for the high power beam dump, copper flanges and heat links. Thanks to Sato-san.