[NAOJ Sato, Kokeyama]
The V-shape high power beam dump was assembled today. Also the copper flange attachement was installed in the innner side of the phi 400 flange of +Y of the IFI chamber. We also made 10 of the thick heat links to connect from the dump to the copper flange.
Our next plans
- assemble one more dump and test with a high-ish power in the PSL room
- place the first dump in IFI chamber, connect the heat links
- misalign and tune the PRM angle so that the beam hit to the dump