Simon, Yano, Akutsu w/ help of Furuta, Hayakawa, Nakata, Yoshimura
Installation of the final, 4th WAB into EXC has started. Today we received the WAB at the Mozumi entrance, and brought it into the X-end room with T3 for 3-km long. The engine crane was also brought. Along with them, we also brought a desk, a shelf, and some parts including the WAB traverser and tools.