[Takahashi, Sato]
- Opened the side hatch of cross tube.
- Opened the top chamber.
- Fixed the IP.
- Fixed the BF at 84mm in height.
- Removed the vertical secondary coils for BF damper.
- Fixed the wire receptacle in the TF.
- Pushed down the keystone from -12mm to -19mm in the TF.