Reports 1-1 of 1 Clear search Modify search
MIF (General)
yuta.michimura - 23:17 Tuesday 23 October 2018 (6681) Print this report
POS table move: preparations around OMC

[Hayakawa, Somiya, Otabe, Nakashima, Michimura]

POS optical table currently placed besides OMM chamber (klog 2625) will be moved to SR2 area in Nov 8-9 (JGW-T1809183).
For preparations, we moved the OMC rack and cleaned up the area (see attached photos).

To move the OMC rack, we had to unplug some of cables related to OMMT1 and OSTM.
These cables will be put back after we pull out the POS table from the clean booth (probably on Oct 25?)

Images attached to this report
Search Help
×

Warning

×