Reports 1-1 of 1 Clear search Modify search
VIS (EX)
yoshinori.fujii - 20:07 Wednesday 17 October 2018 (6593) Print this report
Drift during pumping down, brief report

R. Takahashi, L. Trozzo, Y. Saito, Y. Fujii,

The attached is tthe trends of the ETMX IP/BF-LVDT/GAS. For the time being, no problem was found. (we compenstaed the pumping-down drift by the STMs by a few times.)
The figure includes the start time and this finishes at the time when the pressure is ~ 0.2 atm.

[Note]
-- Somehow BF-GAS height was shanged by more thn 2mm This is to be traced and to be compensated.
-- Even though the IP was kept at the position when the pumping down was stared, the QPD lost the light, due to the BF-LVDT drift in Yaw. The BF-LVDT positions will be tuned.
-- More detailed imformation will be summarized tomorrow.

Images attached to this report
Non-image files attached to this report
Search Help
×

Warning

×