Reports 1-1 of 1 Clear search Modify search
AOS (Baffles & Beam dumps)
tomotada.akutsu - 1:05 Thursday 11 October 2018 (6497) Print this report

WAB in IXC

final finalizing

Simon, Akutsu

Have finalized the WAB in IXC after the adjustment of cryopayload+Type-A reported here.

  1. Detached the suspension protectors.
  2. Connected an easy heat link from the top of the upper stage to the body structure. Actually the connection to the upper stage has been already done in the past. For the body strucutre, a M3x5 screw, the spring washer, and the washer were used (Fig 1 and 2).
  3. Attached a thermometer to the body structure (Fig 3); with this there are two thermometers in total for the WAB suspension. Actually the connection to the burndy connector has been already done in the past (Fig 4). The thermometer was attached with a M3x8 screw, the spring washer, and the washer were used.
  4. Attached a wide heat link from the body structure to the breadboard. M6 screws, the spring washers, and the washers were used (Fig 5-7).

In the current design, the protectors hide some screw holes for the work 2 and 3, so we needed to detach the protectors first as described in 1.

Images attached to this report
Search Help
×

Warning

×