Reports 1-1 of 1 Clear search Modify search
AOS (General)
kenta.tanaka - 1:32 Wednesday 10 October 2018 (6477) Print this report
Installation optics for green-path of GPT at X-end
[Michimura, Akutsu, K.Tanaka]
 
On 2018/10/09 
 
We set up optical system for green-path on the table in front of EXT chamber, except for the QPD borads (Please see JGW-T1808962 for optical layout). I also attatched the picture. We marked screw holes on the table every 10 holes. And,we labeled all the mirror mounts with the part number of the optics. we found the position of GST2 was 25mm far from GLNS1, so we moved it to default position. Height of Gig-E camera is a bit of short. 
Images attached to this report
Search Help
×

Warning

×