Reports 1-1 of 1 Clear search Modify search
VIS (IX)
ryutaro.takahashi - 22:04 Thursday 04 October 2018 (6426) Print this report
Repair of FR in BF

[R.Takahashi, Sato + Tomaru, M.Takahashi, Kimura]

  1. Opened the cross tube.
  2. Replaced the parts to fix the FR blades. Old parts had been completely bended.
  3. Released the cryo-payload (CP). The height of keystone was too low with the FR at the midium point.
  4. Removed some ballast weights from the CP. The height of keystone became 68mm.
  5. Closed the cup of BF.
  6. Connecting the cables from the CP to the side plates on the BF.
Images attached to this report
Search Help
×

Warning

×