AOS (Beam Reducing Telescopes)
tomotada.akutsu - 21:41 Tuesday 25 September 2018 (6283) Print this report
TMS-VIS installation

Uraguchi, K. Nagano, Hasegawa, K. Tanaka, Akutsu

Did several installations of some parts.

Actuator coils

Installed new three actuator coils for horizontal moves, which Uraguchi-san brought from Mitaka, as replacement of the damaged coils reported here.

LVDT# Act coil# (ref) Geophone#
1 2 H1
2 4 H2
3 5 H3

Before doing those works, I wiped yokes of the horizontal actuators as they got dust by the peeled off kapton coats.

Geophones

Got back six geophones to the original positions: Geo H1, H2, H3, V1, V2, V3.

New connector panels

Replaced the connector panels with the newer designed ones (Fig 2-6). During the work, the LVDT#4's was cut again at the point where it was cut in the past. I repaired it with copper pipe (Fig 1). Later need to be electric isolated; the measured resistance recovered to 94.2 ohm.