Reports 1-1 of 1 Clear search Modify search
VIS (IX)
yoshinori.fujii - 22:37 Thursday 16 August 2018 (5827) Print this report
Comment to Setting of PI (5824)

The gap between the EQ-stop ring to BF body was following:
before this adjustment: 63.3 mm (average of 3 points, 61.5 mm, 62.0 mm and 66.5 mm)
after the adjustment: 63.4 mm (average of 61.8 mm, 62.0 mm and 66.5 mm).
This adjustment did not change the position of BF, for some reason BF seemed to be tilted in roll though..

[Note]
1. For the time being, the primary coil holder of BF-LVDT-H2 (of ITMX) is close to the secondary coil (figure 1). this will be tuned somehow after all the suspension is released.

2. For some reason, the current limit was working at the ITMX-digital rack today, I turned off an AI chassis for cryopayload-blade (see figure 2). after an installation of additional power supply, soon this will be turned on again.

Images attached to this comment
Search Help
×

Warning

×