AOS (Baffles & Beam dumps)
takashi.uchiyama - 8:44 Friday 01 June 2018 (5142) Print this report
Marking of beam line in the IYA chamber.
31 May 2018.

Telada, Yokozawa, Uchiyama.

We marked expected beam line in the IYA chamber.

1: We made a line on the floor which is parallel to the beam line without ITM. The beam line position was measured before.
2: We made a point on the support structure which is future beam position using ITM.
Future beam position is shifted from the past beam position by 21.8mm in +Y direction. 21.8mm comes from 14mm+7.8mm in the document JGW-G1807659.
3: Finally we made lines on the breadboard and on the upper channel of the support structure in the IYA chamber. The line is representing future beam using ITM.

Comments to this report:
takaaki.yokozawa - 11:09 Friday 01 June 2018 (5144) Print this report
IYA chamber -> IXA chamber