At Mitaka
12 geophone pods are being assembled in a clean room at ATC in NAOJ. Mechanical assebmbly has mostly done.
The remaining work is;
- check the signals (via digital system)
- close the flanges
[Note]
-a cable from geophone pod to geophone distributor is missing now. If we could get that, this work will be completed soon.
-ID numbering is not yet done.