Reports 1-1 of 1 Clear search Modify search
VIS (SR2)
yoshinori.fujii - 16:09 Friday 23 March 2018 (4529) Print this report
geophone pod assembly
  Basic assembly of 4 geophone pods has been done. their spectrum looks healthy (ref. /users/VIS/TypeB/180323/, blue is the signal of the one used in BS now, which was measured long time ago, and the others are the signals which are newly assembled). 
  -the flanges of the pods are not closed yest since the amount of the following stuffs is not enough:
    --phi-150 gasket * 1
    --rubber sheets (3mm * ~phi77) * 9
  -For the completion of the assembly, we have to put the above inside the pods and then we have to close the flanges.
    --this work is going to be done in this April.
 
  Notes:
  -the channel for GEO-H1 of SR2 rack is used in this test. Not yet re-changed.
  -used pre-amp bords are sn.160, sn.155, sn.146 and sn.149
  -a swager(black one) has been returned into SRM booth from IYC booth.
  -photos are available from here: 22th, 23th
Images attached to this report
Non-image files attached to this report
Search Help
×

Warning

×