Reports 1-1 of 1 Clear search Modify search
VIS (IX)
ryutaro.takahashi - 17:55 Friday 16 February 2018 (4211) Print this report
Setting of BF
[Takahashi, Ishizaki, Sato]

1) Shifted up the height of the secondary coil of LVDT by 2mm.
2) Calibrated the LVDT again. See the blue line in the plot.
3) Repaired the D-sub connector for the LVDT.

As other work:
- Repairing the side stoppers.
Images attached to this report
Search Help
×

Warning

×