[Izumi, Inoue, Nakano]
Beam pointing sensors for the input beam to IMC has been installed. The layout is attached.
- Installed the optics. (see the attached layout)
- Laid a cable between PSL room and the k1ioo rack
- Preapared MEDM screens. You can see those windows by clicking 'IP1' or 'IP2' button on K1IMC-LSC window.
- centered each QPDs.
It should be calbrated at some point.