Keiko, Kiwamu,
We have been silently assebling the DC QPDs for IOO since the last week.
This is a berief update on that.
- The plan is to prepare 6 QPDs in total for the use for IOO.
-
So far we have assembled 2 units with a pair of temporary posts for each.
- They are put in the top rack of the rightmost decicator in the PSL ante room, waiting for the installation.
- At some point in future, we will swap the temporary posts by a custom base plate which Keiko alredy ordered.
-
In addition, we have partially assembled 4 units.
- We need to install the QPD boards and base plates. Otherwise they are complete.
- To be continued...