slow beam shutter installation
[Kokeyama, Izumi, Kawamura, Somiya]

We assembled a safety beam shutter system that was to be installed in IMM.
The shutter system consists of a Uniblitz vacuum compatible shutter, 3 panels, and 2 legs for stands.
We plugged in D-sub cable to the connector flange that is also used for the IMMT1 electronics.
The D-sub cable and the shutter will be connected via Accu-glass 100181/100171 pins but we stopped
working for the day before connecting the pins (the pins are already attached to the cables).

During the work, it turned out that M2 bolts we brought for the assembly was short (L=8mm)
and we borrowed 3 bolts (L=10mm) from VIS. I will buy and returned them asap.