Reports 1-1 of 1 Clear search Modify search
VIS (EY)
ryutaro.takahashi - 22:32 Wednesday 10 May 2017 (2737) Print this report
Setting of F1
[Takahashi, Ishizaki, Sato, Furuya]

1) Repaired broken cables.
2) Lifted down the maraging wire for cryo-payload into the cryostat again.
3) Checked the response of F1. Added one more ballast mass on the F2. Total number of ballasts is two.
4) Siting condition in release sensor: DP 3, BF 1, F3 0, F2 3, F1 3
5) Lifted down the EQ stop into the corrugate tube. The end plate for F1 sit on the frame lock.
6) Extended the EQ stop up to the top plate.
Images attached to this report
Search Help
×

Warning

×