VIS (EY)ryutaro.takahashi - 20:52 Monday 03 April 2017 (2647)
Print this reportLifting down the 3.3m wire[Takahashi, Ishizaki, Sato, Okutomi, Shindo, Furuya]
We lifted down the 3.3m wire for the cryo-payload. The wire was hung by nylon line with a collar. It took a time to untangle the skein of the nylon line. The wire was caught at the cross tube and inserted to the cryo-shield. The head of wire is making an appearance from the cryo-shield.