koki.okutomi - 19:03 Wednesday 22 February 2017 (2523) Print this report
Installation work toward F3 stage

[Takahashi, Ishizaki, Sato, Shindo, Okutomi]

Cabling

  • We did cabling around the BF

BF cap assembling

  • We assembled BF side clamps with delivered countersunk screws
  • We put the BF cap on the BF body 

Assembling of EQ-stop poles to F3 stage

  • Our installation work is moving to the F3 stage
  • EQ-stop poles to the F3 stage is assembled in half

Foothold setup

  • To proceed the assembling work to the F3 stage, we prepared higher footholds beside the top chamber
    • Ishizaki-san fixed the two footholds together with a pipe by himself
  • It seems that the footholds are a little low to do checking of the installation procedure
    • To check height of each filters and their keystones, we didn't lower the DP stage even the F3 stage assembling is starting
    • So the F3 stage will be now higher than initially proposed