VIS (EY)
koki.okutomi - 18:19 Wednesday 15 February 2017 (2489) Print this report
Cabling around BF

[Takahashi, Sato, Shindo, Sawada, Okutomi]

Cabling around the BF

  • Done:
    • Stepper motor for the Fishing Rod (operation checked)
    • Release Sensors on the EQ-stop DP stage
  • Ongoing:
    • GAS LVDT and actuator
    • Release Sensors on the EQ-stop BF stage
  • Setup for GAS LVDT operation check and rough calibration got ready
    • We can get single-ended signals using a D-sub => BNC Converter (JGW-S1605714)
    • We're going to check the LVDT signal with an oscilloscope (it means analog setup)

One feedthrough flange installed

  • Shindo-san and Sawada-san installed a feedthrough flange on the north side of the top chamber

Photos >>> https://goo.gl/photos/JZR85StDGddZoXWQ7

Images attached to this report