[Takahashi, Ishizaki, Shindo, Sawada, Okutomi]
What we did:
- Cone bellows at the feet of the Pre-isolator are set
- End plate of the EQ stop is assembled on a table, on which the dummy payload will sit
-
Pre-assembling of the BF damper is ongoing
- Glue on the coil bobbins got hard and the coil wires are now securely fixed to the bobbins
- Primary coils and magnets are assembled
Photos >>> https://goo.gl/photos/kfqu5N1p4aDVv7eN7