Reports 1-1 of 1 Clear search Modify search
VIS (EY)
koki.okutomi - 18:25 Thursday 02 February 2017 (2428) Print this report
Hole to the abyss opened

[Takahashi, Ishizaki, Shindo, Okutomi]

Shindo-san from Mirapro joined!!

The EYV chamber opened

  • The vertical hole to the EYC cryostat is exposed (see attached photo)
  • The mashroom head of the chamber is put on a palette and carried behind the hole
  • We covered the chamber with transparent sheets
  • During this work, one nut dropped into the gap of hole to the colagte duct
    • We covered the base of the chamber to avoid more falling accidents
    • The nut is found and returned to the EYV room

BF damper pre-assembling

  • Ongoing
  • Some glues to fix coil wires to the bobbin are easily dettached
    • I did additional gluing on them
  • One vertical and one horizontal secondary coil is assembled
  • The wire of coils is not connected to some connectors
    • We have to add additional cable and connect to D-sub connectors

Photos >>> https://goo.gl/photos/B3Te6Cxv5A4tj6229

Images attached to this report