[Takahashi, Ishizaki, Shindo, Okutomi]
Shindo-san from Mirapro joined!!
The EYV chamber opened
- The vertical hole to the EYC cryostat is exposed (see attached photo)
- The mashroom head of the chamber is put on a palette and carried behind the hole
- We covered the chamber with transparent sheets
-
During this work, one nut dropped into the gap of hole to the colagte duct
- We covered the base of the chamber to avoid more falling accidents
- The nut is found and returned to the EYV room
BF damper pre-assembling
- Ongoing
-
Some glues to fix coil wires to the bobbin are easily dettached
- I did additional gluing on them
- One vertical and one horizontal secondary coil is assembled
-
The wire of coils is not connected to some connectors
- We have to add additional cable and connect to D-sub connectors
Photos >>> https://goo.gl/photos/B3Te6Cxv5A4tj6229