Reports 1-1 of 1 Clear search Modify search
VIS (SR2)
fabian.arellano - 17:45 Monday 19 July 2021 (17583) Print this report
Comment to Oplev hardware (17549)

With Hirata-san.

  • Using the horizontal fishng rods I moved the IP close to the setpoint.
  • The GAS filters were already close to the setpoint.
  • I open the vacuum chamber and aligned the collimator such that the beam reached the suspended mirror close to the centre.
  • The I aligned the receiving optics such  that the beams reached both QPDs.
  • I made sure the beam in the length sensing path went through the lens at the centre.

Tomorrow I will check the position of the micrometers and aim to set the lenth sensing QPD in a suitable place with respect to the lens.

Hirata-san checked the new screw system for locking the suspended breadboard.