With Hirata-san.
This is a report for the work carried out yesterday.
See pictures in album PR3 Remedying Work.
- We locked the IRM and moved the three vertical OSEMs either into range or to a better position.
- We released the IRM and measured a few transfer functions, which showed the payload is heathly.
- For the purposes of checking reproducilility we measured the pitch of the mirror again using the good laser level; we got -3.3mrad, which is the value we were expecting.