With Hirata-san.
See pictures in album PR2 Remedying Work.
Today we inspected the OSEMs. We wantes to make sure none of the flags were close to touching the OSEM bodies.
- We locked the IRM only and moved V3 and V2 OSEM panels to give more space to the flags.
- We released the payload and measured the pitch again using the good laser level as an oplev. It was 1.2 mrad although it was supposed to be 3.3 mrad. Maybe our improvised oplev has a large uncertainty or we may have done a mistake. I'll keep watching the suspension.
- We set pitch to 3.3 mrad using the picomotor.
- We measured a couple of transfer functions and they were fine.