Reports 1-1 of 1 Clear search Modify search
VIS (PR2)
fabian.arellano - 18:14 Wednesday 14 April 2021 (16469) Print this report
Comment to Tightening of the inner wire locating clamps. (16417)

With Hirata-san.

Summary: The payload looks healthy according to IM transfer functions and the mirror pitch is at nominal value of 3.3 mrad.

See pictures in album PR2 Remedying Work.

  • After we measured the deviation from the horizontal of two laser levels (klog 16465), we used the good one (Tajima Zero) to measure the pitch of the mirror.
  • It was 5 mrad, which is more reasonable than the value we measured with the broken laser level (see entry 16460).
  • We used the picomotor to bring the pitch to 3.3 mrad, which is the nominal value.
  • OSEMs V3 and H3 were out of range; we locked the IRM and moved them into range.
  • We removed the plastic cover from the SF, released the keystone and closed the chamber.
  • We measured IM transfer function from the office: they all are fine, including IM-V.
Search Help
×

Warning

×