Reports 1-1 of 1 Clear search Modify search
VIS (EY)
ryutaro.takahashi - 21:20 Wednesday 31 March 2021 (16366) Print this report
Comment to Setup of F1 (16276)

[Takahashi, Sato]

  1. Disassembled the EQ stop to the top ring.
  2. Lifted up the EQ stop. The end plate for F2 was put on the frame lock.
  3. Hung the F1 by the crane.
  4. Fixed the F2 keystone by the long nut and studs bolt. Released the F2.
Search Help
×

Warning

×