[Takahashi, Sato]
- Replaced the cone bellows. It was necessary to remove the piston head temporaly. One of three has been done by Horiuchi-san on 26th.
- Lifted down the EQ stop. The F1 stage was put on the frame lock.
- Extended the EQ stop to the top ring.
- Lifted down the EQ stop so as to access the BF. We could not put the top ring on the frame lock due to the wire for the cryo-payload.
- Checked the conectability of BF-LV line. #3-8, #4-9 pins were not available. The terminator was connected to the BF-DCPV line to employ the empty pins.
- Lifted up the EQ stop. The F1 stage was put on the frame lock.