[Takahashi, Sato, Horiuchi]
We started the setup of IP.
- Connected the in-vacuum cables from the geophone pods to the feedthrough #7. The port of 5-7 were used.
- Connected the D-sub cables from the feedthrough to the geophone distributer which was taken from the EX.
- Checked the signals of geophones. The geophones were not working.
- Checked cable connection and pin signments. We found the direction of pre-amp attached onto the feedthrough was wrong.