Nakagaki, Miyo
We reconnect the disconnected cables which were disconnected due to clean up by Fujimi-sangyo company in October. (BTW, I could not find any klog about disconnection work for PR2...)
We moved the PR2 minirack to the 2nd floor so that Mirapro can remove the bellows on the PR2 chamber easily according to Ito-san's advise.
During this work, we found that we use difference length cable between feedthrough to the satelite box as listed below table, and now we changed so that we use same length cable for satelite box.
Cable Name | Before | After |
TM_H1_SAT | 2 m | 3 m |
TM_H2_SAT | 3 m | 3 m |
TM_H3_SAT | 10 m | 3 m |
TM_H4_SAT | 10 m | 3 m |
IM_V1_SAT | 10 m | 3 m |
IM_V2_SAT | 10 m | 3 m |
IM_V3_SAT | 3 m | 3 m |
IM_H1_SAT | 2 m | 3 m |
IM_H2_SAT | 2 m | 3 m |
IM_H3_SAT | 2 m | 3 m |
Because we could not recover the other cables for the minirack including stepper and picomotor, we have to do that in next week.
---
Photos: https://photos.app.goo.gl/C7xX32d6348kETkh8