[Takahashi, Sato, Horiuchi]
We almost finished the F2 stage and started the F1 stage.
- Checked the connectablity of cables. Some cable-connectors need to be repaired.
- Released the side and bottom stoppers for the F3.
- Lifted down the EQ stop into the corrugate tube.
- Put the end plate for the F2 on the frame lock.
- Installed the F1 into the clean booth.
- Hang the F2 from the F1 with the wire(#320). The height of keystone of F2 was -3300 in count.
- Replaced the side stoppers on the end plate for the F1.