ryutaro.takahashi - 20:28 Wednesday 17 February 2021 (16050) Print this report
Comment to Setup of F2 (15993)

[Takahashi, Sato, Horiuchi]

We almost finished the F2 stage and started the F1 stage.

  1. Checked the connectablity of cables. Some cable-connectors need to be repaired.
  2. Released the side and bottom stoppers for the F3.
  3. Lifted down the EQ stop into the corrugate tube.
  4. Put the end plate for the F2 on the frame lock.
  5. Installed the F1 into the clean booth.
  6. Hang the F2 from the F1 with the wire(#320). The height of keystone of F2 was -3300 in count.
  7. Replaced the side stoppers on the end plate for the F1.