Cabling for temperature control equipment has been created.
The following areas were investigated and the results are summarized.
PRM, PR3
PR2, BS, SR2
SR3, SRM
The next section summarizes the results of the survey for IXC, IYC and both ends.
For more details, please see the following document
JGW-E2112582