Reports 1-1 of 1 Clear search Modify search
VIS (SR3)
fabian.arellano - 17:35 Monday 15 February 2021 (16018) Print this report
Comment to Ballast mass adjustment on top of BF (16007)

With Hirata-san and Washimi-san.

Pictures at SR3 remedying work after O3.

  • Temperature: 22.8 °C.
  • Becuase there was an earthquake over the weekend I measured IM transfer fiunctions (TF) first; the system looks healthy.
  • This screenshot shows the OSEM readout before the measurement of the TFs; these values are a reference of the alignment.
  • We modified ballast mass as follows (see the notebook for the precise position on BF):
    • +X side: 101.754 g → 148.529 g, Delta_m = 46.775 g
    • -X side:    37.243 g →   84.236 g, Delta_m = 46.993 g
  • We closed the chamber and let the system damp (over lunch).
  • The OSEM and F1 LVDT readout are shown in this other screenshot.
  • F1 LVDT is 406 um (aim is 461 um per klog 15322).
  • In entry 16007 I wrote the aim was 416 um, but that value is wrong; the correct value is 461 um.
  • The OSEMs' readouts are very similar to what they were before adding ballast mass, meaning that there was no significant change in the orientation and position of the IRM.
  • I measured IM transfer functions and the system looks healthy.
  • Tomorrow we will remove some mass to bring it up to around 461 um.
Search Help
×

Warning

×