[Takahashi, Sato, Horiuchi]
- Finished the cabling between the F2 and F3.
- Released the F3. Fixed the keystone of F3.
- Calibrated the LVDT in the F2. The height of secondary coil was adjusted. Finaly the height was set to -17mm.
[Takahashi, Sato, Horiuchi]