[Takahashi, Miyo, Sato, Horiuchi + CRY]
The cryo-payload was connected to the BF.
- Replaced the signal generator to the add-on board for the LVDT driver. Adjusted the amplitude so as to keep the last one (6.45Vpp in REF).
- Pushed down the F0 keystone by 2.4cm. The height of BF went to 78/76/70mm.
- The cryo-payload was connected to the maraging wire by the CRY team.
- Connected the cables toward the top onto the side plates of BF.
- Assembled back the LVDT coils for the BF damper.
- Addjusted the tilt of BF. The 440-g ballast was reallocated (not yet fixed). The height of BF became 74/74/74mm.
- Mounted the geophone pods on the IP table. The locations are #24 at ACC1, #25 at ACC2, and #29 at ACC3 (refer IP map).