Installation of ITMX to the cryostat

[Tomaru, Kimura, MTakahashi, Sawada(Hokuto), Ushiba with Type-A team]

Before installation, we first measured the weight of IX cryogenic payload, which is 197.0 kg.
Then, we installed the payload into the cryostat and conntect the cables.

After the cabling, we found that two cables don't work well.
One is cables for thermometer on MNR.
The other is for TM actuator H1.

Currently, we are not sure where are the problems, so we will investigate it tomorrow.