tomotada.akutsu - 19:22 Monday 26 October 2020 (15324) Print this report
WAB traversing work has started at EYC

Hirata, Akutsu + help w/ Ushiba and Nishimoto and Kimura

We started with preparation of the WAB traverser. It took me remember how hard this work was...

  • Unpack wraps from the stuffs to be used. Prepare tools and so on...
  • Fixed the suspended WAB.
  • Dealt with a tiny forgotten task at that time: inserted raw pins for thermometers to the PEEK budndy connector. For comfirmation, we connected the burndy connectors and touched each thermometer, and check whether the cryocon's read would change; they changed so succeeded.

Before trying to move the WAB, we need to detach or do some for the 6N Al heat links, but I have no good idea...