Reports 1-1 of 1 Clear search Modify search
OBS (General)
kouseki.miyo - 1:03 Friday 17 April 2020 (14210) Print this report
Shift report
Duration : 2020/04/16 17:00-25:00 JST, all times posted in JST
Operator shift : K.Kokeyama
Co-operator shift : K.Miyo
Supported by T. Yamamoto
 
Shift Summary :
BNS Range : 0.5 Mpc 
Environment : Microseisms were not noisy (seismic alert monitor always display yellow all frequency band)
Duty cycle : 79% 
 
Time / Event
17:00 / Shift started. The detector was operating stably.
20:59 / Lost lock. Due to M5.9 earthquake in Myanmar (USGS Link)
  • Yamamoto-san updated the optical gain and actuator efficiency before going to observation.
22:40 / Recover to observation state (Lock loss continued for 101 minutes)
25:00 / Detector is continuously observing.
Search Help
×

Warning

×