Duration : 2020/04/12 1:00-9:00 JST, all times posted in JST
Operator shift : T.Ushiba
Co-operator shift : K.Miyo
Supported by T. Yamamoto and T. Yokozawa
Shift Summary :
BNS Range : 0.6 Mpc
Environment : Microseisms were quiet but earthquakes hit
Duty cycle : 92%
Time / Event
1:00 / Shift started. The detector lost lock and previous shift worker requested to OBSERVATION state.
1:09 / Recoverd lock.
4:36 / Lost lock. Aligned OMC before requesting to OBSERVATION state.
5:15 / Recovered lock (lost lock for 39 minutes)
9:00 / Continuous locking. (End)